WORK IS STEADY IN THE AREA,. LOCAL CONTINUING TO WORK ON SEVERAL PLA'S WITH MULTIPLE PROJECTS UNDER THEM AND HAVE SOME SCHOOL PROJECTS STARTING IN LATE SPRING. SEVERAL NEW JOBS ARE BEING BID IN THE JURISDICTION, BUT NO CONTRACTS HAVE BEEN AWARDED YET. THERE ARE 16 DIFFERENT CONTRACTORS WITH WORK AT THE DATA CENTER. WORK IS VERY BUSY IN THE AREA & LOCAL HAVING A HARD TIME FILLING MANPOWER REQUESTS. (6-6), WORK IS STILL STEADY IN THE AREA. MILKY WAY DAIRY IN MARICOPA PAYING $9.00 OVER SCALE. FIELD OF DREAMS PROJECT ALSO ANTICIPATED TO TAKE OFF IN THE SPRING AS WELL AS A CASINO REMODEL THAT SHOULD TAKE OFF AFTER THE 1ST OF THE YEAR. EXPECTED TO LAST A WEEK OR SO. CVE WORKING 5-10'S AS WELL AS PAYING $100/DAY INCENTIVE IF YOU LIVE 75 MILES FROM SITE OR PERDIEM IF YOU LIVE FARTHER. HARRAH'S/CAESAR'S HOTEL TOWER HAS BEEN AWARDED TO FRISCHHERTZ ELECTRIC, BUT HASN'T BROKE GROUND YET. NO NEW WORK EXPECTED TO START UNTIL 1ST QUARTER OF 2023. CALL HALL FOR DETAILS.(7-22), DEFINED BENEFIT LOCAL PENSION(23.65 % OR $9.13) & CONTRIBUTION PENSION/ANNUITY (9% OR $3.44), WORK IS SLOW IN 481 AND MOST CALLS ARE 40 HR/WEEK CALLS. GOOD LOCAL, WORK, UNION WORKERS & CONTRACTORS. CALL HALL FOR ANY DETAILS. THEY ARE ALSO PAYING AN ADDTIONAL $100/DAY. TESTING NEEDS TO BE SCHEDULED 4 TO 6 WEEKS PRIOR TO TAKING A CALL IN VEGAS. endobj STILL WAITING ON A DECISION FROM PUC ON WHETHER OR NOT THEY ARE GOING TO APPROVE A 450 MW SOLAR PROJECT. FACBOOK IS STILL ONGOING & HAS YEARS LEFT ON IT. MAY BE SOME WORK AT HONDA IN 2023. PROJECT WORKING 5-10'S & EXPECTED TO LAST ANOTHER 2 YEARS WITH NEW PAINT SHOP, NEW BATTERY PLANT AND ONGOING WORK INSIDE THE PLANT. THE MPEC CENTER IN CLARKSVILLE WORKING 4-10'S W/POSSIBLE OVERTIME. THERE ARE A COUPLE OF UPCOMING OUTAGES IN THE FALL. P1 CONSTRUCTION HAS WORK AT HILLS DOG FOOD PLANT IN TONGANOXIE, KS & HOPE TO BE HIRING IN FEBUARY. THREE PROJECTS TOTALLING 720 MW OF SOLAR THAT SHOULD BE PLACING CALLS BY MID-SEPTEMBER. (ALL INFORMATION PERTAINING TO INITIAL SIGNING & RESIGNS IS POSTED ON LOCAL'S WEBSITE., MEMBERS WILL RECEIVE A CONFIRMATION EMAIL ONCE WE HAVE YOUR RESIGN.IF YOU DON'T GET ONE, CONSIDER YOURSELF NOT RESIGNED FOR THE MONTH., LOCAL HAS INFORMATION REGARDING LODGING AND OTHER AMENITIES THAT ARE AVAILABLE IN THE DULUTH AND SURROUNDING AREAS (SOME IN TOWN $99 WEEKDAYS, $120 FRIDAY & SATURDAY NIGHTS) AND MORE 75 TO 90 MILES FROM JOBSITE (DEPENDING ON WHAT YOUR WILLING TO PAY).(1-20), 246 STEUBENVILLE, OH-(740) 282-7572, CONTIBUTION PENSION (33%) & ANNUNITY (10%), WORK IS STILL SLOW IN THE AREA. ROSENDIN STILL PUTTING CALLS IN FOR WOOLHAWK DATA CENTER WORKING 6-10'S. LOCAL HAS SEVERAL DECENT SIZED PROJECTS GOING INTO 2023, BUT NOT LIKELY TO GET INTO BOOK 2 UNTIL THEN. (9-24), WORK IS STILL SLOW IN THE AREA. HUSTON ELECTRIC PICKED UP THE HYPERSONIC AIR RESEARCH FACILITY (HARF) PROJECT IN PURDUE. THERE IS ALSO A GOOD MIX OF COMMERCIAL WORK COMING FOR THE SPRING.INDUSTRIAL CALLS REQUIRE STATE LICENSE FROM ANY STATE. LARGE DATA CENTER JOB IN EASTERN HENRICO IS ONGOING & PAPERMILL IN HANOVER COUNTY. WORK INCLUDES MASSIVE 750 MILLION DOLLAR PROJECT WITH A 3 YEAR TIMELINE & A BILLION DOLLAR PRICETAG. OFFICE CLOSE 12:30PM TO 1:30 PM. A PAID DUES RECEPT GETS YOU ON THE BOOKS.(10-5), DEFINED ($6.37) & CONTRIBUTION PENSION ($5.11), LOCAL IS HOLDING IT'S OWN AT THIS TIME. "Being in a labor union was great, in a lot of . TO LOOK FOR JOBS: CLICK THE DISPATCH TAB ON ibew191.com FOR POSTED OPEN CALLS. CALL HALL FOR DETAILS.(1-7), CALLS CONSISTS COMMERICAL, SERVICE TRUCK, INDUSTRIAL & EVEN LINEMAN WORK. MOST SURROUNDING LOCALS IN THE JURISDICTION HAVE BEEN ABLE TO KEEP LOCAL HANDS WORKING. MOST PROJECTS WORKING 40/HRS WEEKS.ACCOMMODATIONS ARE HARD TO COME BY IN THE AREA, SO PLEASE PLAN ACCORDINGLY!CA STATE LICENSE REQUIRED ON MOST PROJECTS, BUT SOME WILL TAKE TRAINEE CARD. CALL HALL FOR DETAILS., LOCAL HAS SLOWED IN MOST ALL AREAS IN THE STATE OF ALASKA & IN THE FAIRBANKS & SOUTHEAST AREAS. CALL HALL FOR DETAILS., WORK HAS BEEN STEADY IN THE AREA. EXPECTED TO LAST A WEEK OR SO. STETNER RUMORED TO BE UP THEIR AMOUNT & EXPECTED TO HAVE MORE WORK IN CHENEY AT THE COLLEGE. IT IS APPRECIATED.(1-20), WORK IS BUSY IN THE AREA WITH MULTIPLE UNFILLED CALLS!! THERE ARE SOME OTHER PROJECTS BEING DISCUSSED ON HOLD AT THIS TIME, NAMELY THE PORT ALBANY OFFSHORE WIND TURBINE MANUFACTURING & GLOBAL FOUNDRIES (CHIP PLANT). ALBAUGH CHEMICALS IS ALSO ADDING ON & THAT IS EXPECTED TO BE A GOOD SIZED PROJECT AS WELL AS SOME OTHER SMALLER 10-15 MAN JOBS AROUND THE AREA. MEMORIAL HOSPITAL IS STALLED DUE TO MECHANICAL MATERIAL COMPLICATIONS, HOPEFULLY SPRING START. THERE IS SOME UPCOMING WORK AT PHARMACEUTICAL PLANT AND PIFIZER, WHICH STEEL IS CURRENTLY GOING UP ON. 2 0 obj THOSE CALLS ARE NOT REQUIRING THE STAE CERT & ARE ACCEPTING THE TRAINEE CARD IN LIEU. SACHS HAS PUT IN CALLS FOR PRE-OUTAGE WORK BEFORE THE SHUTDOWN & IS EXPECTED TO HIRE MORE BEFORE IT BEGINS. LOCAL HAS HAD SOME OPEN CALLS FOR PHARMACEUTICALS PROJECT THAT IS A GOOD INSIDE JOB THAT IS EXPECTED TO LAST THRU THE WINTER. WORK IS REALLY SLOW IN THE AREA AT THIS TIME WITH NOT MUCH ON THE HORIZON. MAJOR FIRE DID SHUT DOWN BP UNTIL AT LEAST THE END OF THE YEAR & LOCAL IS EXPECTED REPAIR WORK SOON.THE LOCAL SOLAR PROJECTS REQUIRE MANPOWER BY OHIO RESIDENTS. EXPECTED TO PICK UP AGAIN AFTER THE 1ST OF THE YEAR WITH MORE SHUTDOWNS COMING UP ALONG WITH SEVERAL OTHER PROJECTS. AWAITING ANNOUNCMENT OF BATTERY PLANT, ANTICIPATING SPRING START. PAYNECREST CALLS FOR FACEBOOK ARE IS WORKING 5-9'S & AN 8 WITH MILLER CALLS FOR GOOGLE WORKING 5-10'S & AN 8 ON SATURDAY WITH GOOGLE ALSO REQUIRING A BACKGROUND CHECK. LOCAL EXPECTS TO NEED HELP AT THAT TIME., WORK IS STEADY IN THE AREA WITH WORK ANTICIPATED TO START SOON. FORD BLUE OVAL BATTERY PLANT IN GLENDALE, KY WILL BE STARTING OUT AT 5-10'S & LIKELY 6-10'S WITH NO INCENTIVES AT THIS TIME., WORK HAS SLOWED DOWN. 16 Stats That Prove the Importance of Local SEO - HubSpot CALL HALL FOR DETAILS.(4-8), LOCAL IS BUSY & CALLS ARE GETTING INTO BOOK 2. CALL HALL FOR DETAILS. KIEWITT HAS COMMISSIONED ADN "FIRST FIRE"THE BLUE WATER ENERGY SOURCE IN EAST CHINA. CALL HALL FOR DETAILS.. CALL HALL FOR DETAILS.(12-16), WORK IS STILL SLOW & NOT LIKELY TO CHANGE ANYTHIME SOON. MAZ DATA CENTER PAYING $8.00 OVER SCALE & WORKING 60 HR/WEEK SCHEDULE. WORK INCLUDES MASSIVE 750 MILLION DOLLAR PROJECT WITH A 3 YEAR TIMELINE & A BILLION DOLLAR PRICETAG. JEFFREY ENERGY CENTER HAD A FIRE & SEEMED TO HAVE CANCELED THEIR UPCOMING OUTAGE. LOCAL'S TWO UTILITY SCALE SOLAR PROJECTS (GEMINI & YELLOW PINE) ARE GOING TO BOOK 2 SOON. WHEN THE OUTAGE OFFICALLY STARTS ON FEBUARY 26TH, IT WILL BE WORKING 2 SHIFTS OF 6-12'S WITH ONE DAY PAID AT 1.5X, ONE DAY PAID AT 2X & ONE OFF. CALL HALL FOR DETAILS.MOST CALLS DO REQUIRE MICHIGAN STATE LICENSE. THIS WORK IS EXPECTED TO GET INTO BOOK 2.ALL CONTRACTOR WILL BE REQUIRING A COLORADO STATE LICENSE & HOUSING IS VERY EXPENSIVE IN THE AREA.CALL HALL FOR DETAILS & LICENSING INFORMATION.(1-7), DEFINED ($4.00) & CONTRIBUTION PENSION ($4.74), META DATA CENTER HAS STARTED WITH MULTIPLE CONTRACTORS ONSITE INCLUDING CAPITAL, R/S, ECA, WITEC & BAKER GROUP. COMPANY DOES HAVE THE RIGHT TO MOVE YOU FROM MAINTENANCE TO CONSTRUCTION AT WILL. SCHEDULES ARE ALIGNING WITH THIS OUTAGE TO FINISH UP SO A MEMBER COULD GO RIGHT INTO ANOTHER OUTAGE OUT OF BEAVER, PA IN LU-12. YOU CAN GO TO THEIR WEBSITE OR LOCAL'S WEBSITE TO FIND AVAILABLITY FOR TESTING TO ACQUIRE THIS CERT. LUCID MOTORS CASA GRANDE IS PAYING $75/DAY & WORKING 50/WEEKS WITH SOME SATURDAYS. THE NEXT WILL BE AT CUMBERLAND CITY & WILL START AT THE END OF SEPTEMBER & EXPECTED TO LAST ABOUT 75 DAYS WORKING OVERTIME AS WELL. LOCAL HAS SEVERAL DECENT SIZED PROJECTS GOING INTO 2023, BUT NOT LIKELY TO GET INTO BOOK 2 UNTIL THEN. LOTS OF OTHER WORK COMING AS WELL. TOOLING INSTALL WILL BE PICKING UP MORE WORK AS WELL, WITH JOB EXPECTED TO LAST THROUGH NOVEMBER OF THIS YEAR. THERE ARE 2 WATER TREATMENT FACILITIES IN SONORA & HUGHSON THAT ARE ONGOING, BUT HAVING THE SAME DIFFICULTIES WITH PARTS/MATERIALS. CALL HALL FOR DETAILS.(12-16), WORK IS STEADY IN THE AREA. THE PROJECT HAS STARTED & CONTRACTOR WILL BE PLACING MANPOWER CALLS AS NEEDED. HALL SHOULD HAVE MORE INFORMATION FOLLOWING THE HOLIDAYS. TEST IS OFFERED USUALLY ONCE A MONTH & YOU NEED THE DOCS IN 3 WEEKS PRIOR. All rights reserved. CURRENT RED BADGE IS NOT REQUIRED & WILL BE GIVEN ON THE COMPLETION OF EPHQ & IN PROCESSING. MOST LIKELY JANUARY OR BEGINNING OF FEBRUARY BEFORE IT STARTS BACK UP AGAIN & EXPECTED TO GO HOT & HEAVY TO FINISH UP THAT PHASE SO THEY CAN TURN IT OVER. THERE ARE ALSO A FEW CALLS STILL FOR REFUELING OUTAGE AT BROWNS FERRY NUCLEAR PLANT FRO DAY & ZIMMERMAN WORKING 6-12'S. CA STATE ELECTRICAL LICENSE REQUIRED FOR MOST CALLS. THERE ARE MULIPLE 40 HR/WEEK CALLS AVAILABLE.AN IOWA UNCLASSIFIED LICENSE IS GOOD FOR MOST CALLS & IS AVAILABLE FOR $20 FOR THE YEAR, WHICH IS ALSO PRO-RATED DEPENDING ON WHEN YOU AQUIRE IT. CALL HALL FOR DETAILS.(1-23), LOCAL HAS HAD CALLS FOR WORK AT BASF. SOLAR FARM AND WINDFARM SCHEDULED TO START IN OCT 2022. THERE IS ALSO A FAB SHOP IN THE JURISDICTION ONGOING TO SUPPORT FACEBOOK & GOOGLE PROJECTS IN OTHER SURROUNDING LOCALS. NEED A CURRENT TRAVEL LETTER, PAID UP DUES RECIPT TO SIGN BOOKS MUST HAVE A WASHINGTON ST LICENSE-NO RECIPROCITY.http://lni.wa.gov/tradeslicensing/electrical/(12-10), DEFINED PENSION ($9.10 EDISON) & CONTRIBUTION ($5.02 DISTRICT 9& $1.30 FLEX), WORK HAS SLOWED IN THE AREA. (1-7), THE $650 MILLION DOLLAR PBF REFINERY IN CHALMETTE EXPANSION EXPECTED TO LAST UP TO 18 MONTHS ONCE IT STARTS. LOOKING AT POSSIBLE WORK COMING AT CHEMICAL PLANTS IN CALVERT CITY, KY THIS SPRING THAT SHOULD ALSO NEED HELP FROM BOOK 2. EXPECTED TO START MANNING UP AGAIN LATE WINTER/EARLY SPRING 2023. CALL HALL FOR DETAILS.(4-8), 601 CHAMPAIGN - URBANA, IL - (217) 352-1741, WORK HAS REMAINED SLOW IN THE AREA. CALL HALL FOR DETAILS.(11-10), JOBLINE - (804) 355-1500 OR (800) 572-9221, DEFINED CONTIBUTION PENSION (21.7% OR $7.29) & ANNUNITY (3%), H&W = $23.5 % ($7.89), CALLS HAVE SLOWED IN THE JURUSDICTION. CALL HALL FOR DETAILS. CALL HALL FOR DETAILS.(8-22), DEFINED CONTRIBUTION PENSION (13.1%) & ANNUITY (16%), LOCAL HAS A DIRECT REDUCED IRON PROJECT ONGOING & LOOKING TO MAN UP AROUND APRIL/MAY. WORK PICTURE IS STILL STEADY, BUT A LITTLE SLOWER. I'M WORKING ON GETTING IT ALL UPDATED SOON. NOT A LOT EXPECTED TO PICK UP THIS YEAR. PAYING $325/WEEK INCENTIVE (ALL HOURS WORKED MON-FRI) FOR TRAVELERS WITH A VERIFIED ADDRESS 75 MILES OR FURTHER FROM PLANT LOCATION ALONG WITH $4 AND HOURINCENTIVE & $25/DAY PER DIEM. GM SPRINGHILL JOB IS ONGOING & STILL MANNING UP. R/S ELECTRIC HAS HILLYARD CHEMICALS THAT'S BUILDING A LARGE WAREHOUSE THAT IS EVENTUALLY GOING TO BE IN PRODUCTION OVER TIME, SO IT SHOULD STRETCH OUT FOR A WHILE. SOLAR FARM IS IN A BIT OF A HOLD AS CONTRACTORS WAITING ON SOLAR PANEL THAT ARE CAUGHT UP IN CUSTOMS. JOB IS WORKING 5-10'S AND AN 8 ON SATURDAY. THE KOLHER-VIKRELL PLANT JOB IN CASA GRANDE, AZ IS PAYING $75/DAY & WORKING 50 HR/WEEK SCHEDULE. REFINERY HAS END OF YEAR PROJECTS WITH CALLS AVAILABLE WORKING 5-10'S. WORKS LOOKS GOOD GOING INTO SPRING & LOTS OF WORK SCHEDULED GOING INTO THE NEW YEAR. GHIBP INCLUDES THE BRIDGE, PORT OF ENTRY, AND THE I-75 INTERCHANGE WITH A 2024 COMPLETION DATE. WITH ALL THE WORK, THEY EXPECTED TO BE STRETCHED THIN & WILL NEED A LOT OF HELP FROM OUR TRAVELING BROTHERS & SISTERS. CALL HALL FOR DETAILS.(1-23), DEFINED ($6.01) & CONTRIBUTION PENSION ($5.21), DAYBOOK & 3 DING SYSTEM IN EFFECT, UNFILLED CALLS WEEEKLY. THE PROJECT IS WORKING FIRST & SECOND SHIFTS. THEY ALSO HAVE A $139 MILLION DOLLAR HIGH SCHOOL IN GRETNA, NE, HAVE BEEN AWARDED THE NEW SARPY COUNTY GOOGLE PROJECT THAT IS LOCATED NEAR DATA CENTER AND ALSO AWARDED WORK ON A NEW $53 MILLION DOLLAR WATER PARK IN GRETNA, NE. UA Local 72 Reviews: What Is It Like to Work At UA Local 72? MOST CALLS REQUIRES OSHA 10 & SECURE FIT EXAM WILL BE REQUIRED. UA 63 Welder: PRO ELECTRIC HAS CARGO LARGO WAREHOUSE, HALLMARK DISTRIBUTION WAREHOUSE, WEBBER UP, FORT OSAGE ADMINISTRATION BUILDING &. THE TWO PROJECTS COMBINED EQUAL OVER 300 MW WITH BATTERY STORAGE AS WELL. EXPECTED TO LAST UNTIL THE END OF THE YEAR.CALL HALL FOR DETAILS.(7-31), WORK IS STILL SLOW IN THE AREA. (12-10), WORK IS STEADY FOR LOCALS. CALL HALL FOR DETAILS.(11-24), WORK IS STILL SLOW IN THE AREA. POWERHOUSE WORK ALSO COMING & THAT IS EXPECTED TO BE WORKING OVERTIME AS WELL.CALL HALL FOR DETAILS.(10-18), DEFINED ($9.27) & CONTRIBUTION PENSION ($5.50), (BENEFITS ARE % SO THEY INCREASE WITH OVERTIME HOURS), NOT A LOT GOING ON IN FLINT RIGHT NOW & WORK IS STILL SLOW IN THE AREA. CALLS GOING TO LAS VEGAS STRIP PROJECTS UNFILLED. PROJECTS INCLUDE WORK AT TINKER AIR FORCE BASE, WIN STAR CASINO, STILLWATER MEDICAL CENTER, RARE EARTH PROJECT, WORK AT KONAWA POWER PLANT & WORK AT THE VA. (12-6), CHECK LINK FOR INFO: www.public.psiexams.com, JOBLINE - (404) 523-8100 OR (800) 526-1064, LOCAL HAD A LARGE CONTRACTOR CLOSE IT'S DOORS & ABOUT 358 WIREMEN LOST THEIR JOBS. NOT MUCH EXPECTED TO GET INTO BOOK 2 FOR THE NEXT MONTH OR SO AS LOCALS FILL REMAINING JOB CALLS IN THE AREA. EXPECTED TO NEED HELP FROM TRAVELING BROTHERS & SISTERS. LOCAL HAS QUITE A BIT OF WORK ON THE HORIZON, BUT SEVERAL SOLAR FARMS THAT WERE ANTICIAPTED TO START SOON HAVE BEEN DELAYED, POSSIBLE A YEAR, DUE TO SUPPLY & PANEL SHORTAGES. ELAND BUILT BY BAKER ELECTRIC WILL START MODULES GOING INTO THE SSPRING AS WELL AS SANDRINI STARTING GLASS AT THE SAME TIME. THERE IS ALSO A FAB SHOP IN THE JURISDICTION ONGOING TO SUPPORT FACEBOOK & GOOGLE PROJECTS IN OTHER SURROUNDING LOCALS. CONTRACTOR EXPECTED TO BE BUSY THROUGHOUT THE YEAR WITH DIFFERENT BATTERY JOBS STARTING IN STAGGERED TIMES IN 2023. PROJECT STARTED ABOUT 2 MONTHS AGO & HAS A 10 MONTH DURATION. LOCAL HAS A LARGE SOLAR PROJECT THAT IS IN NEED OF WIREMEN. MOST LIKELY BE WRAPING UP BETWEEN MARCH-MAY.